The Technical Design Phase

The Technical Design Phase December 2024- April 2025    Following planning permission being secured in Summer 2024, the design plans are now being developed further so they can be fully costed and are technically ready for the build phase .  This stage is being Funded by Lambeth Council. A series of workshops will be held […]

The Emma Cons Cycle Challenge

The Emma Cons Cycle Challenge  Hi, I’m James Jenne-Cons , do you want to join me in making a difference?   I’m doing a crazy cycle challenge as I really want to make an impact in my local community by helping to regenerate the area known as Emma Cons Gardens (opposite the Old Vic ) […]